New to the Netherlands? Words with a have a short explanation. Tap or click them.
You found a handyman, checked the company and agreed on a price. Now comes the part nobody explains: getting them to actually come, making the visit go well, and not paying for time wasted. Good Dutch handymen are busy, and small jobs are the first to wait. This guide is about the practical side: how to ask so you get a quick "yes", how to group small jobs to save money, what to prepare before the visit, what's normal on the day, and what to keep afterwards.
The idea in simple words
A handyman's day is like a taxi driver's day. Driving to you, parking and carrying tools up the stairs all take time, and they earn nothing during it. So a 15-minute job across town isn't attractive, but a half day of work in one place is.
Make your job easy to say yes to. Send a clear message with photos. Put several small jobs together. Prepare the room, the parking and the materials. You'll get someone sooner, and you'll pay less.
The most important facts
- Group small jobs: many handymen charge a call-out fee and a minimum of 1 or 2 hours. Six small jobs in one visit can cost less than half of six separate visits.
- WhatsApp is normal: most Dutch handymen plan, send prices and confirm by WhatsApp. Photos and a short video help them give a price without coming first.
- Days start early: 7:30 or 8:00 in the morning is a normal start, and work often ends around 16:00 or 16:30.
- Noise hours: national rules allow building work by companies on weekdays and Saturdays from 7:00 to 19:00. Not on Sundays and public holidays. An apartment building's own rules can be stricter.
- Parking is your cost: in city centres, parking can cost the handyman a lot, and it ends up on your bill. A visitor permit can make it much cheaper.
Words you need to know first
- Job (klus): a piece of work in or around the house. A list of small jobs is a klussenlijst.
- Half a working day (dagdeel): a morning or an afternoon. Handymen often plan and sometimes charge per dagdeel.
- Call-out fee (voorrijkosten): a fixed amount for coming to your home, on top of the hourly price.
- Meter cupboard (meterkast): the cupboard near the front door with the fuse box, the meters and often the main water tap.
- Plasterboard (gipsplaat): thin boards used for inside walls. They sound hollow when you knock on them.
- Recycling centre (milieustraat or afvalbrengstation): the municipal place where you bring waste that doesn't go in your normal bin.
Why it's hard to get a handyman to come
There are not enough technical workers in the Netherlands, and good handymen are often booked for weeks. They choose the jobs that fit their day best. Small jobs, far away, with unclear information, are the ones they say no to, or never answer.
That's not personal. It's also why a message like "Hi, can you fix something in my bathroom?" often gets no reply. The handyman can't tell how long it takes, which tools to bring, or what to charge.
How to ask so you get a quick "yes"
Send one clear message (WhatsApp, email or a platform like Werkspot) with:
- What you want, in short sentences. "Hang 3 shelves of 80 cm on a living room wall" is better than "some shelves".
- Photos and measurements. A photo of the whole wall or room, and one close-up. For a leaking tap or a broken lock, a 20-second video and a photo of the brand or type label.
- The type of wall, if you know it (see below).
- Your postcode and the floor you live on. "3rd floor, no lift" matters for heavy materials.
- Who buys the materials: you, or the handyman.
- When you're available. Give a few options, and say if you're flexible. "Any weekday morning in the next 2 weeks" is easy to plan in.
Write in simple English, or use a translation app and send it in Dutch. Many handymen speak English, but not all. A short message in Dutch is often answered faster.
Group your small jobs and save money
Most handymen charge a call-out fee, and many charge at least 1 or 2 hours, even if the job takes 15 minutes. So keep a list on your phone of everything small that needs doing, and book one visit for all of it.
A simple example, with the average 2026 handyman rate of €47 an hour and a call-out fee of €30:
| 6 separate visits | 1 visit for all 6 jobs | |
|---|---|---|
| Call-out fees | 6 × €30 = €180 | €30 |
| Hours paid | 6 × 1 hour minimum = €282 | 4 hours = €188 |
| Total | €462 | €218 |
Prices differ per handyman and per city, and materials come on top. But the idea always works: one longer visit is cheaper per job, and a half-day job is easier to plan in, so you'll often get a date sooner too.
Know your walls before you hang anything
Dutch homes have very different walls, and the wall decides which drill, plugs and screws the handyman needs. Tell them in advance, so they don't have to come back.
| Wall | Where you find it | How to tell |
|---|---|---|
| Concrete (beton) | Main walls and ceilings in most apartments built after the 1950s | Very hard to drill, grey dust. Needs a heavy hammer drill. |
| Brick (baksteen) | Older houses, especially from before the 1960s | Solid when you knock. Red or orange dust when drilled. |
| Plasterboard (gipsplaat) | Inside walls in newer homes, attics and renovated rooms | Sounds hollow when you knock. Needs special plugs (hollewandpluggen), and can't hold very heavy things. |
| Light blocks (gipsblokken or gasbeton) | Many inside walls between rooms in homes and apartments | Solid, but soft and easy to drill, with white dust. Needs special plugs for heavy things. |
Watch out for hidden pipes and cables. Electric cables usually run straight up or down from a socket or switch, but there's no guarantee. A good handyman checks with a detector (leidingzoeker) before drilling. In a bathroom or kitchen, water pipes can run anywhere. Floor heating (vloerverwarming) means no drilling into the floor at all.
In a home built before 1994? Some materials, like old wall panels, floor tiles or pipe covers, may contain asbestos. If you're not sure, say so before anyone drills, sands or breaks anything.
Prepare the visit
- Parking. In city centres, a handyman can pay a lot for parking, and that cost goes on your bill. Many municipalities give residents a visitor permit (bezoekersvergunning) or a visitor parking app with a lower rate. Register the handyman's number plate before they arrive. Check your municipality's website for how it works where you live.
- Access. Tell them which bell to ring, the floor, and whether there's a lift. Dutch stairs are steep and narrow. For long planks, a kitchen worktop or a big appliance, measure the stairs and the turns first.
- Materials. If you buy them yourself, have everything there before the visit, with the receipts. Ask the handyman for a list first. If they buy them, agree how they charge for them.
- Flat-pack furniture. Make sure all boxes are delivered and complete. A missing part halfway costs you a second visit.
- Clear the space. Move furniture, plants and fragile things away from the work area. You pay for the time it takes them to do it.
- Know where things are. The meter cupboard, the fuse for each room and the main water tap. The handyman will ask.
- Tell your neighbours. In apartment buildings, a short note in the hall or the neighbours' letterboxes is very normal: what day, how long, and that there will be some noise. It keeps relations good.
- Own an apartment? Check the building's house rules (huishoudelijk reglement). They often set quieter hours than the national rules, and some ask you to tell the owners' association (VvE) about bigger work.
On the day: what's normal
- Early starts. A morning appointment can mean 7:30 or 8:00. Some handymen give a time window (tussen 8 en 12) instead of an exact time.
- Confirm the day before. A short WhatsApp ("Still OK for tomorrow morning?") is normal and prevents no-shows on both sides.
- Coffee. Offering coffee or tea is a Dutch habit and is always appreciated. You don't need to offer lunch. Many handymen bring their own and take a short break around 12:00.
- No tip needed. Tipping isn't expected in the Netherlands. A good review online helps a self-employed handyman more.
- Direct talk. A Dutch handyman may tell you plainly that your idea won't work, or that the wall is too weak. That's not rude. It's useful advice. Ask what they'd do instead.
- Stay reachable. You don't need to watch, but be at home or reachable for questions. A decision that waits an hour for you is an hour you pay for.
- Something extra? If you want to add a job during the visit, ask what it costs first. Then send a short WhatsApp to confirm, so you both have it in writing.
Waste: who takes it away?
Old tiles, wood, plasterboard and packaging don't go in your normal bin. Ask before the job if taking it away (afvoeren) is included in the price. If not, you have three options:
- Take it to the recycling centre yourself. Most municipalities accept small amounts of building waste from residents, sometimes for a small fee. Check the rules and opening times on your municipality's website.
- Book a bulky waste pickup (grofvuil) for things like old furniture or a door. This is often free or cheap, but usually not for building waste.
- Order a waste bag or container for a bigger job. Putting a container on the street may need a permit from your municipality.
Asbestos has its own strict rules: it must be packed in a special way and brought to the recycling centre separately. Never put it in a normal bag or container.
Hiring a person, not a company?
A neighbour or someone from a local Facebook group may offer to help for cash. Hiring a private person for work in and around your home is allowed under the home services scheme (regeling dienstverlening aan huis), if they work for you on fewer than 4 days a week. You don't have to arrange their taxes, but you must pay at least the minimum wage. Remember: a private person usually has no business insurance, and there's no company you can complain to if something goes wrong.
After the job: keep a home file
A little admin now saves you money later, and makes the next handyman's job faster.
- Take photos before walls are closed. If pipes or cables are moved or added, take photos with a tape measure in the picture. Years later, you'll know where not to drill.
- Write down paint colours. The brand and the colour code (kleurcode) of every room. Touching up a wall is easy if you know the exact colour.
- Keep invoices, guarantees and manuals in one folder or on your phone. You need them for guarantee claims, for your insurer, and when you sell the home or move out.
- Leave a review if you were happy. It's the best thanks for a self-employed handyman.
- Keep the good ones. Save their number and send your next list to them first. Handymen give priority to customers they know, who prepare well and pay quickly.
Useful Dutch phrases
| English | Dutch |
|---|---|
| I have a few small jobs. Can you come for half a day? | Ik heb een paar kleine klussen. Kunt u een dagdeel komen? |
| Here are some photos of the job. | Hier zijn een paar foto's van de klus. |
| What does it cost, including VAT and call-out fee? | Wat kost het, inclusief btw en voorrijkosten? |
| The wall is concrete / plasterboard. | De muur is van beton / gipsplaat. |
| Do you bring the materials, or should I buy them? | Neemt u het materiaal mee, of moet ik het kopen? |
| Is taking away the waste included? | Is het afvoeren van het afval inbegrepen? |
| Is it still OK for tomorrow? | Is het morgen nog goed? |
| Would you like coffee or tea? | Wilt u koffie of thee? |
| Can you send me the invoice by email? | Kunt u de factuur mailen? |
Your checklist
- Keep a list of small jobs, and book one visit for all of them.
- Send one clear message: what, photos, measurements, wall type, floor, materials, dates.
- Agree on the price, the materials and the waste before the visit.
- Arrange visitor parking and tell the handyman how to get in.
- Clear the space, check deliveries, and tell your neighbours.
- Confirm the day before.
- Confirm any extra jobs in writing during the visit.
- Take photos of hidden pipes and cables, and keep the invoice in your home file.
- Leave a review and save the number of a good handyman.
Before you hire someone, read our guide Hiring a handyman in the Netherlands for prices, VAT, checking a company and your rights. Renting? First check who fixes what in a rental home, because many repairs are your landlord's job.
Official sources and useful links
- IPLO: noise rules and hours for building work (Dutch)
- Rijksoverheid: the home services scheme (Dutch)
- IPLO: rules for removing asbestos yourself (Dutch)
This is general information based on the rules in November 2026. Prices are examples, not fixed rates. Parking, waste and noise rules differ per municipality and per building, so check your municipality's website and your building's house rules.


